Plans for new building
The school is about to begin phase two of our building project to become a permanent three form entry. From late July work will begin to strip out the existing hall, toilets and staff areas in preparation to start the main demolition works in August.
Week 1
The building site has been very busy this week, with initial ground works being completed and access from Witham Road being created. The children have enjoyed watching different machinery arriving on site and the fence being erected!
Week 2
On Thursday as we were walking through the corridor, we heard crunching noises as the old year 6 block was being knocked down. We saw the remaining wall of the art room with the original black board! We then watched the old year six block being demolished! They have also dug huge holes for the foundations!
By Joel, Evie S, Millie- May, Demee, Ayham and Erin, 3B

Weeks 3 and 4
Lucky 4B got to go into the restricted building site to see the builders at work. We stood in amazement as we watched the large white truck pour the sloppy cement into the six foot deep holes.

Weeks 5 and 6
Further ground works were completed over the last two weeks in preparation for the steel frame.

Weeks 7 - 10
The tower crane has been erected and is being used to assemble the steel frame!


Week 11
The metal decking has been placed on top of the steel frame.

Week 12
The first bricks on the new build have been laid!

Week 13
There has been cement poured onto the roof ready for the playground!

Weeks 14 and 15
The ground works have continued...

Week 16
The view from the roof!

Weeks 17 and 18
Screeding the rooftop playground

Weeks 19 and 20
The new build is taking shape and we have had some visitors already to view the site!

Week 21
Windows and doors have begun to go in.

Week 22
Underfloor heating is being fitted.

Week 23
The Multi-Utility Games Area (MUGA) fence posts have gone in and the surface is being treated.

Weeks 24 and 25
The new building is being insulated and partition walls are being put into place.